Platform Nos. 21 (right) and 24 (left) are both occupied by Class 373 formations in this northward view of the distorted roof. The roof was formally deemed complete on 7th July 1992, when British Rail Board Chairman Sir Bob Reid and two local school children inserted the final locking pin into the last roof truss. © David Glasspool Collection
This is a southward view from platform 23 beneath the roof's 1,000 tonnes of steelwork, two acres of stainless steel cladding, and two-and-a-half acres of glass. © David Glasspool Collection
A north eastward view shows the tracks curving towards the buffer stops. The grey structure on the left was a surround for one of the escalators leading from the platform to the low-level concourse. © David Glasspool Collection
Return to the Kent Rail Homepage or alternatively, check for Updates.
Website & Copyright information - Links - Contact the Webmaster